How much is the decoration of three rooms and two

2022-07-22
  • Detail

Project 1: Foundation Engineering

wall chipping (gypsum plaster) 1120.00

wall blank base treatment 560.00

door sealing head 240.00

door pocket base (Blockboard) 280.00

light brick wall (120 mm double-sided plastering) 1575.00

removal of bay window 480.00

removal of insulation layer 800.00

project 2: Waterway Circuit engineering

strong and weak current construction (lump sum price) 7200.00

waterway construction (lump sum price) 1550.00

strong Installation of weak current box 100.00

change down pipe 222.00

change down pipe 189.00

balcony water outlet 300.00

balcony hot water 300.00

Project III: guest restaurant and aisle

emulsion paint base treatment (putty) 2360.00

emulsion paint 944.00

gypsum board flat ceiling 225.00

gypsum board linear light trough ceiling 1840.00

.Gypsum board shaped ceiling 1035.00

shoe cabinet (including door and ecological board) 2720.00

decorative cabinet, wine cabinet 2072.00

decorative cabinet, wine cabinet door 218.00

general specification of floor tiles (500 × 500< Size ≤ 800 × 800) 1820.00

TV background wall 1800.00

item 4: primary bedroom

latex paint base treatment (putty) 1120.00

latex paint 448.00

wardrobe cabinet body (ecological board) 3348.00

wardrobe door (ecological board) 436.00

gypsum board sealing the upper part of the cabinet body 150.00

item 5: secondary bedroom

latex paint base treatment (putty)720.00

latex paint 288.00

wardrobe cabinet (ecological board) 2511.00

wardrobe door (ecological board) 327.00

gypsum board sealing on the upper part of the cabinet 150.00

secondary bedroom 2

emulsion paint base treatment (putty) 720.00

emulsion paint 288.00

wardrobe cabinet body (ecological board) 2511.00

wardrobe door (ecological board) 327.00

gypsum board sealing on the upper part of the cabinet 150.00

item 6: kitchen (

common specification of wall tiles (300 × 450 < size ≤ 300 × 600) 1375.00

general specification of floor tiles (size 300 × 300) 297.00

kitchen waterproof treatment 405.00

kitchen and bathroom package pipes 182.00

doorway stone paving 50.00

item 7: bathroom

wall tile general specification (300 × 450 < size ≤ 300 × 600) 990.00

common specification of floor tiles (size 300 × 300) 198.00

toilet backfilling and surface leveling 252.00

toilet waterproof treatment 990.00

kitchen and sanitary package pipes 182.00

lintel paving 25.00

toilet sewer protection works 200.00

item 8: balcony

latex paint base treatment (batch scraping) 300.00

latex paint 120.00

General specification of floor tiles (200 × 200 < size ≤ 800 × 800) 495.00

common specification of wall tiles (300 × 450 < size ≤ 300 × 600) 275.00

balcony railing base tiling 210.00

storage cabinet (ecological board) 2790.00

storage cabinet door (ecological board) 981.00

Item 9: miscellaneous

material upstairs cost 300.00

material transportation cost 300.00

indoor garbage removal cost 300.00

lamp installation 200.00

sanitary ware installation 150.00

hardware installation 100.00

finished product protection 300.00

ground solid 300.00

three bedrooms and two living rooms with more than 90 square meters are common room types at present, and the above quotation is expected to help.You know the current market, To provide you with a strong reference. Finally, Xiaobian also kindly reminds you that if your home is about to be decorated and you want to get the decoration quotation of the house, then quickly enter the Wuhan home decoration network decoration bidding platform and get the accurate quotation in 10 seconds. There are dozens of decoration companies in Wuhan for you to choose, as well as free room measurement, free supervision, decoration fund reduction and other concessions. Details

广州精神心理医院

郑州不孕不育医院

杭州结石医院

Copyright © 2011 JIN SHI